Auro Intersects 496.5m Grading 0.76 g/t Gold and 0.12% Copper, Including 212.5m Grading 1.12 g/t Au and 0.14% Copper at the Santa Barbara Gold-Copper Project, Ecuador

Go back to Auro Intersects 496.5m Grading 0.76 g/t Gold and 0.12% Copper, Including 212.5m Grading 1.12 g/t Au and 0.14% Copper at the Santa Barbara Gold-Copper Project, Ecuador
(AMEX: AURFF) Delayed: 1.21 -0.09 (6.92%)
Previous Close $1.30    52 Week High
Open $1.33    52 Week Low
Day High $1.35    P/E N/A 
Day Low $1.19    EPS
Volume 281,764