Grid Battery Metals Begins Drilling the Clayton Valley Lithium Project

Go back to Grid Battery Metals Begins Drilling the Clayton Valley Lithium Project
ALBEMARLE CORPORATION (NYSE: ALB) Delayed: 131.34 +3.00 (2.34%)
Previous Close $128.34    52 Week High $87.29 
Open $128.00    52 Week Low $45.78 
Day High $133.67    P/E 32.67 
Day Low $127.12    EPS $4.02 
Volume 620,615       

Cypress Development Corporation (AMEX: CYDVF) Delayed: 0.19 -0.01 (5%)
Previous Close $0.20    52 Week High $0.16 
Open $0.20    52 Week Low $0.02 
Day High $0.20    P/E N/A 
Day Low $0.19    EPS $0.00 
Volume 8,878       

(AMEX: EVKRF) Delayed: 0.01 --0 (-0%)
Previous Close $0.01    52 Week High
Open $0.01    52 Week Low
Day High $0.01    P/E N/A 
Day Low $0.01    EPS
Volume 3,130