Tamboran completes largest drilling program in Beetaloo Basin

Go back to Tamboran completes largest drilling program in Beetaloo Basin

Tamboran Successfully Completes Largest Beetaloo Basin Drilling Program

October 15, 2025 3:28 PM UTC

Highlights

Tamboran Resources has successfully completed the 2025 Shenandoah South drilling program, the largest program ever conducted in the Beetaloo Basin. The program included the batch drilling of the Shenandoah South -4H (SS-4H), -5H and -6H wells, each successfully completed with a target lateral length of 10,000-feet. The three wells have been successfully cased and suspended ahead of stimulation activities. The average spud-to-TD (total depth) across the program was 26.7 days, with the drilling and casing time delivered within the 35-day forecast. The... More